Langham Creek at Fry Road Rehabilitation of Detention Pond
Scope of Work: Texas Dewatering (TXD) started the project in May 2019 and completed the project on schedule with a completion date of December 2019. The end goal of the project was to restore the drainage channel to its pre-Hurricane Harvey condition. The project consisted of excavating 50,000 cubic yards of built up sediment inside the channel that was then hauled off the project site to a designated disposal location. 3,000 cubic yards of slope repairs were done, and 15 acr