Barker Watershed Sediment Removal Program for the Harris County Flood Control District


Scope of Work:

The Harris County Flood Control District has contracted Texas Dewatering to desilt the Barker Reservoir Watershed and restore the channel back to its pre-Harvey conditions. The project is extensive – covering seven separate job sites across the Cinco Ranch / Katy areas. The Harris County Flood Control District has subbed out the inspection services to Versa and the design services to IDS Engineer and hired Stuart Consulting Group as the consulting team for the project which requires Texas Dewatering to coordinate and schedule with several entities and the local community around the project.


Location:

Katy, Texas


91 views0 comments